Pool Installation Process

Your dream pool is just 7 simple steps away with our expert team of specialists managing all the key stages for you – from site preparation and excavation through to pool placement and final handover. Before you know it, you’ll be relaxing poolside and extending summer in the best way possible.

Our Pool Installation Process In 7 Simple Steps

Your pool installation process couldn’t be simpler with our team of specialists managing each of the key stages for you – from the first site inspection, to preparing your property, right through to final handover – our team is on hand to help and provide expert advice, every step of the way.

Stage 1 - Council Permits & Engineering

Getting started couldn’t be easier! Our in-house Compliance Team will take care of the paperwork by submitting plans to Council for approval of your new pool. Once the building permit has been granted our team can get to work organising on-site inspections and starting the exciting process of bringing your dream backyard to life.

Stage 2 – Site Inspection & Preparation

You’ll be appointed a dedicated Site Supervisor who will start the installation process with a 1-2 hour site inspection – this is generally completed around 1-4 weeks before your installation is scheduled. Your Site Supervisor will measure your backyard, confirm the pool location, check underground utilities, finished pool height, filtration equipment position, site access and any other installation requirements.

 

This inspection is your best opportunity to ask any questions relating to your pool installation directly with your supervisor.

  • If you need to prepare the area before machinery arrives
  • Does any fencing need to be moved for access
  • If you need to protect paving or driveways that form part of the access route.

Stage 3 – Pool Excavation

Once your property is ready, we can start digging. The excavation team will start preparing the area for your fibreglass pool. Installers follow dig sheets and laser measurements for precise excavation. There is a lot of activity on-site during this time with excavators and bobcats requiring regular access between the street and backyard. Once the pool hole has been dug the base material is prepared, screed and levelled to match your selected datum level (finished pool height).

Stage 4 - Pool Delivery & Placement

This is the big day when your new fibreglass pool arrives onsite! Your Installation team completes the final site preparation, confirms the pool position and levels with you before the pool shell is lifted by crane and lowered into the excavated pool hole. Once the temporary pool fencing is erected, to comply with Council regulations, your pool can be part filled with water ready for the next stage of the installation process.

 

This is one of the most exciting parts of the process where the reality of your new pool really starts to take shape.

Stage 5- Backfill, Plumbing & Filtration

Once the pool shell is positioned correctly, backfilling, filtration plumbing and compaction begins. The filtration equipment is installed into the position confirmed during your site inspection. This work is generally completed over 1–7 business days, depending on the project and site conditions. Once these works are completed, you’re ready for the final project stages – electrical connection and the most exciting part – pool handover day.

Stage 6 - Electrical Connection

Your allocated electrician will arrange access and complete the electrical work required for your pool equipment. Depending on the installation schedule, this may be completed earlier in the process.

Stage 7 - Pool Handover

Handover day! Your handover technician will arrange an appointment. Your pool will be cleaned using the technician’s equipment and you’ll receive a theory session on pool filtration, water chemistry and instructions regarding how to maintain and look after your new pool. Before the appointment, make sure to fill your pool to the top of the skimmer box so the final clean can commence.

 

Once handover is completed, it’s onto the finishing touches – including your choice of paving, concreting, decking and landscaping – bringing your backyard vision fully to life with your sparkling new pool as the feature element.

Why Choose Factory Pools Perth?

What Our Customers Say

Excellent
Factory Pools Perth4.4
Based on 361 reviews
Thank you Factory Pools!! I finally got my husband to agree to a pool after visiting factory pools in O'Connor, Thanks Kathy!!. from that day on everything just fell into place. All the staff and contractors have been great, explaining things as they went and I knew if we had any questions the answers would only be a phone call away. Rex and his brother (we called them "the silent hard workers") were amazing and Chris from Hillside Pool Services was really great on hand over day, he really took the time to explain the hows /whys. We are loving our Cove 7 X 3 and are looking forward to the years of family fun.
Positive experience with Factory Pools Perth at O'Connor from Sales to installation process. Timely as planned installation, communication with different departments to navigate the process. Happy with our new pool and looking forward to swim at own backyard.
Thank you, Factory Pools Perth, for a great experience from start to finish, helping us choose the pool that best fits our backyard and getting everything organised. The process was easy and seamless. It was a pleasure working with your company.
Fantastic service from the very beginning throughout the whole process. Excellent knowledge and customer service. We dealt with Matt in sales, Liam site supervisor and Travis on install, all were brilliant to work with. Highly recommend!
Response from the owner:Thank you so much, Linzi! We really appreciate your lovely feedback and recommendation. It's wonderful to hear that Matt, Liam and Travis made the whole process such a positive experience. We'll be sure to pass on your kind words to the team! Enjoy your beautiful new pool!

Kind Regards,
FPP Team
Excellent service. Matt and the team were fantastic especially with our rear block and crane requirements for our new pool. Would definitely recommend
Response from the owner:Thanks so much, Monique! We're so glad to hear Matt and the team looked after you so well throughout the process. We really appreciate your lovely feedback and recommendation.

Kind Regards,
FPP Team

Pool Process Frequently Asked Questions

How long does a fibreglass pool installation take?
While every project differs based on Council and site conditions, a rough guideline from initial consultation to first swim typically spans several weeks – Council approval is generally the biggest variable. We recommend starting the consultation process as early possible – our expert team can walk you through the steps and start the ball rolling with approvals.

Generally, just one day. Once excavation and preparation are complete, the fibreglass pool shell is craned into position on installation day. The installer then checks the position and completes any final levelling required. Post pool installation the remaining project stages to handover generally takes around 15 business days – depending on site conditions.

Your Site Supervisor confirms the pool location, filtration position, finished pool height and other important project details. It’s also your opportunity to ask questions and understand exactly where your pool will sit within your property boundaries.
Yes, you do. Compliant temporary or construction pool safety barrier needs to be in place before we can fill your new pool with water. When the pool is installed our team will test the working operation of the filtration equipment – for us to undertake this step the pool needs to be filled with water first.

Request A Quick Quote

This field is for validation purposes and should be left unchanged.
Name(Required)
Address(Required)
Pool Type
Please Select A Display Centre - Regional Clients Also(Required)
Would You Like A Free Site Visit?
Accepted file types: pdf, png, Max. file size: 12 MB.